Approved Agreements and Contracts MDOT Agreement for Musketawa Trail Connector 06-22-21

View the PDF version Google Docs PDF Viewer

WATCH
                      Agenda Item Review Form
                                                  us                           GO
                           Muskegon City Commission

Commission Meeting Date: June 22 nd , 2021            Title: MOOT Agreement for Musketawa Trail
                                                      Connector

Submitted By: Leo Evans                               Department: Public Works


Brief Summary: Staff is requesting approval of the contract with MOOT for the construction of the
Musketawa Trail Connector and approval of the resolution authorizing the Mayor and Clerk to sign
the contract.

Detailed Summary: This is the standard contract governing projects that are constructed using
federal funds through MOOT. The estimated cost for the project construction is $518,6023.35 with
$181,024 .00 of that being federal surface transportation funding , $315,000.00 being MDNR
Recreational Trails Funding and the remainder being funded through the Cities Major Street
Budget in the 21/22 Budget year.


Work on this trail is expected to commence in August and take approximately 8 weeks to
complete.

Amount Requested : $ O                               Amount Budgeted: $ O


Fund(s) or Account(s):                               Fund(s) or Account(s) :


Recommended Motion:
Approve the attached contract and resolution and authorize the mayor and clerk to sign both.

Check if the following Departments need to approve the item first:
Police Dept.  D
Fire Dept.   D
IT Dept. □


For City Clerk Use Only:
Commission Action :
                            RESOLUTION 2021-59 (E)

RESOLUTION FOR APPROVAL OF A CONTRACT AGREEMENT BE1WEEN THE
MICHIGAN DEPARTMENT OF TRANSPORTATION AND THE CITY OF
MUSKEGON    FOR   HOT   MIX   ASPHALT,  NON-MOTORIZED    TRAIL
CONSTRUCTION ALONG BLACK CREEK ROAD, LATIMER ROAD AND PORT
CITY BOULEVARD FROM SOUTH OF OLTHOFF DRIVE TO KEATING AVENUE.

Moved by Commissioner Rinsema-Sybenga and supported by Commissioner Emory
the following Resolution be adopted:

WHEREAS, entry by the City of Muskegon into Contract no. 21-5202 between the
Michigan Department of Transportation and the City of Muskegon for the
construction of a non-motorized trail to connect the Laketon Trail and the
Musketawa Trail within the City is in the best interests of the City of Muskegon.

RESOLVED, that entry by the City into Contract Agreement Number 21-5202 be and
the same is hereby authorized and approved and the Mayor and Clerk are
authorized to execute said contract for and on behalf of the City of Muskegon .

                                                                        ..,
Adopted this 22 nd day of June, 2021.

                                        BY




                                        ATTES ~ - - - ~

                                             Ann Meisch, City Clerk

                                  CERTIFICATION

This resolution was adopted at a meeting of the City Commission, held on
June 22 nd , 2021. The meeting was properly held and noticed pursuant to the
Open Meetings Act of the State of Michigan, Act 267 of the Public Acts of 1976.
                                               CITY OF MUSKEGON

                                        By~~~
                                               Ann Meisch, City Clerk
NRT, TAP                                                         DA
                                                   Control Section       NRT 61000
                                                   Job Number            208592CON
                                                   Project               21A0562
                                                   CFDANo.               20.205 (Highway
                                                                         Research Planning &
                                                                         Construction)
                                                   Contract No.          21-5202


                                           PART!


       THIS CONTRACT, cons1st111g of PART I and PART II (Standard Agreement
Provisions), is made by and between the MICHIGAN DEPARTMENT OF
TRANSPORTATION, hereinafter referred to as the "DEPARTMENT"; and the CITY OF
MUSKEGON, a Michigan municipal corporation, hereinafter referred to as the "REQUESTING
PARTY"; for the purpose of fixing the rights and obligations of the parties in agreeing to the
following improvements, in Muskegon, Michigan, hereinafter referred to as the "PROJECT" and
estimated in detail on EXHIBIT "I", dated May 26, 2021, attached hereto and made a part hereof:

       PART A-FEDERAL PARTICIPATION
       Hot mix asphalt, non-motorized trail and timber boardwalk constrnction along Black
       Creek Road, Latimer Drive and Po1i City Boulevard from south of Olthoff Drive to
       Keating A venue; and all together with necessary related work.

       PART B-NO FEDERAL PARTICIPATION
       Underground sprinkler system restoration along the limits as described in Paii A; and all
       together with necessaiy related work.

       WITNESSETH:

       WHEREAS, pursuant to Federal law, monies have been provided for the performance of
transportation enhancement activities; and

        WHEREAS, it has been determined that the PROJECT qualifies for such funding by
virtue of its direct relationship with the intermodal transportation system; and

      WHEREAS, the reference "FHWA" in PART I and PART II refers to the United States
Department of Transportation, Federal Highway Administration; and

        WHEREAS, the PROJECT, or p01iions of the PROJECT, at the request of the
REQUESTING PARTY, are being programmed with the FHWA, for implementation with the
use of Federal Funds under the following Federal program(s) or funding:

                        RECREATIONAL TRAILS PROGRAM
                    TRANSPORTATION ALTERNATIVES PROGRAM
09/06/90 STPLSTAP.FOR 5/26/2021                    1
        WHEREAS, the parties hereto have reached an understanding with each other regarding
the performance of the PROJECT work and desire to set forth this understanding in the form of a
written contract.

        NOW, THEREFORE, in consideration of the premises and of the mutual undertakings of
the parties and in conformity with applicable law, it is agreed:

        1.      The patties hereto shall undertake and complete the PROJECT in accordance with
the terms of this contract.

        2.     The te1m "PROJECT COST", as herein used, is hereby defined as the cost of the
physical construction necessary for the completion of the PROJECT, including any other costs
incurred by the DEPARTMENT as a result of this contract, except construction engineering and
inspection.

       No charges will be made by the DEPARTMENT to the PROJECT for any inspection
work or construction engineering.

       The costs incurred by the REQUESTING PARTY for preliminaiy engineering,
construction engineering, construction mate1ials testing, inspection, and right-of-way are
excluded from the PROJECT COST as defined by this contract.

        The Michigan Department of Environment, Great Lakes, and Energy (EGLE) has
informed the DEPARTMENT that it adopted new administrative rules (R 325.10101, et. seq.)
which prohibit any governmental agency from connecting and/or reconnecting lead and/or
galvanized service lines to existing and/or new water main. Questions regarding these
administrative rules should be directed to EGLE. The cost associated with replacement of any
lead and/or galvanized service lines, including but not limited to contractor claims, will be the
sole responsibility of the REQUESTING PARTY.

       3.      The DEPARTMENT is authorized by the REQUESTING PARTY to administer
on behalf of the REQUESTING PARTY all phases of the PROJECT including adve1iising and
awarding the construction contract for the PROJECT or portions of the PROJECT. Such
administration shall be in accordance with PART II, Section II of this contract.

      Any items of the PROJECT COST incurred by the DEPARTMENT may be charged to
the PROJECT.

       4.      The REQUESTING PARTY, under the te1ms of this contract, shall:

               A.     At no cost to the PROJECT

                      (1)     Design or cause to be designed the plans for the PROJECT.




09/06/90 STPLSTAP.FOR 5/26/2021                    2
                     (2)     Appoint a project engineer who shall be in responsible charge of
                             the PROJECT and ensure that the plans and specifications are
                             followed.

                     (3)     Perform or cause to be perfonned the construction engineering,
                             construction materials testing, and inspection services necessaiy
                             for the completion of the PROJECT.

              B.     At least 10 days prior to any ceremony to be held in connection with the
                     PROJECT, notify the DEPARTMENT.

              C.     When issuing any news release or promotional material regarding the
                     PROJECT, give the DEPARTMENT and FHWA credit for participation
                     in the PROJECT and provide a copy of such material to the
                     DEPARTMENT.

        The REQUESTING PARTY will furnish the DEPARTMENT proposed timing
sequences for trunkline signals that, if any, are being made part of the improvement. No timing
adjustments shall be made by the REQUESTING PARTY at any trunkline intersection, without
prior issuances by the DEPARTMENT of Standard Traffic Signal Timing Permits.

       5.     The PROJECT COST shall be met in accordance with the following:

              PART A
              The PART A portion of the PROJECT COST shall be met in paii by contributions
              by the Federal Government. Federal Recreational Trails Program Funds in
              combination with Federal Transportation Alternatives Program Funds shall be
              applied to the eligible items of the PROJECT COST up to the lesser of: (1)
              $496,024, or (2) an amount such that 88 percent, the Federal participation ratio for
              Federal Transportation Alternatives Program Funds combined with Federal
              Recreational Trails Program Funds, is not exceeded at the time of the award of the
              construction contract with Federal Transportation Alternatives Program Funds
              limited to $181,024 and Federal Recreational Trails Program Funds limited to
              $315,000. The balance of the PROJECT COST, after deduction of Federal Funds,
              shall be charged to and paid by the REQUESTING PARTY in the manner and at
              the times hereinafter set forth.

              PARTB
              The PART B portion of the PROJECT COST is not eligible for Federal
              paiiicipation and shall be charged to and paid I 00 percent by the REQUESTING
              PARTY in the manner and at the times hereinafter set forth.

       Any items of PROJECT COST not reimbursed by Federal Funds shall be the sole
responsibility of the REQUESTING PARTY.

       6.     No working capital deposit will be required for this PROJECT.


09/06/90 STPLSTAP.FOR 5/26/2021                    3
        In order to fulfill the obligations assumed by the REQUESTING PARTY under the
provisions of this contract, the REQUESTING PARTY shall make prompt payments of its share
of the PROJECT COST upon receipt of progress billings from the DEPARTMENT as herein
provided. All payments will be made within 30 days of receipt of billings from the
DEPARTMENT. Billings to the REQUESTING PARTY will be based upon the REQUESTING
PARTY'S share of the actual costs incurred less Federal Funds earned as the PROJECT
progresses.

        7.      It is understood that the REQUESTING PARTY is responsible for the facilities
constructed as the PROJECT and that said facilities may require special or unusual operation
and/or maintenance. The REQUESTING PARTY certifies, by execution of this contract, that
upon completion of construction and at no cost to the PROJECT or the DEPARTMENT, it will
properly maintain or provide for the maintenance and operation of the PROJECT, making ample
provisions each year for the performance of such maintenance work as may be required. Upon
completion of the PROJECT, the REQUESTING PARTY shall accept the facilities constructed
as built to specifications within the construction contract documents.

        On projects involving the mobility for bicyclists, the REQUESTING PARTY will enact
no ordinances or regulations prohibiting the use of bicycles on the facility herein before described
as the PROJECT and will amend any existing restrictive ordinances in this regard so as to allow
use of this facility by bicycles. No motorized vehicles shall be permitted on such facility
constructed as the PROJECT except those for maintenance or emergency assistance purposes, or
mobility for persons with disabilities.

        On projects involving the restoration of historic facilities, the REQUESTING PARTY
agrees that the project will not be awarded until the owner of such facilities has an Historic
Preservation Covenant, which includes an Historic Preservation Easement, or an Historic
Preservation Agreement, as appropriate, with the Michigan State Historic Preservation Office in
accordance with 1995 PA 60 for the purpose of ensuring that the historic property will be
preserved. The REQUESTING PARTY also agrees that such facilities shall be maintained and
repaired by the REQUESTING PARTY or owner, as applicable, at no cost to the
DEPARTMENT or the PROJECT, in such a manner as to preserve the historical integrity of
features, materials, appearance, workmanship, and environment.

        On projects which include landscaping, the DEPARTMENT, at PROJECT COST, agrees
to perfonn or cause to be perfonned, the watering and cultivating necessmy to properly establish
the plantings for a period of two growing seasons, in general conformance with Section
815 .03(L) of the DEPARTMENT'S Standard Specifications for Construction.                    The
REQUESTING PARTY shall maintain all plantings following completion of said period of
establishment.

         Failure of the REQUESTING PARTY to fulfill its responsibilities as outlined herein may
disqualify the REQUESTING PARTY from future Federal aid participation in Transportation
Alternatives Program projects or in other projects on roads or streets for which it has
maintenance responsibility. Federal aid may be withheld until such time as deficiencies in
regulations have been corrected, and the improvements constructed as the PROJECT are brought
to a satisfactory condition of maintenance.
09/06/90 STPLSTAP.FOR 5/26/2021                      4
        8.      The performance of the entire PROJECT under this contract, whether Federally
funded or not, will be subject to the provisions and requirements of PART II that are applicable
to a Federally funded project.

       In the event of any discrepancies between PART I and PART II of this contract, the
provisions of PART I shall prevail.

       Buy America Requirements (23 CFR 635.410) shall apply to the PROJECT and will be
adhered to, as applicable, by the patties hereto.

        9.       The REQUESTING PARTY certifies that it is not aware if and has no reason to
believe that the property on which the work is to be performed under this agreement is a facility,
as defined by the Michigan Natural Resources and Environmental Protection Act [(NREPA), PA
451, 1994, as amended 2012]; MCL 324.20101(1)(s). The REQUESTING PARTY also
ce1tifies that it is not a liable patty pursuant to either Patt 201 or Pati 213 of NREP A, MCL
324.20126 et seq. and MCL 324.21323a et seq. The REQUESTING PARTY is a local unit of
government that has acquired or will acquire property for the use of either a transpo1tation
cotTidor or public right-of-way and was not responsible for any activities causing a release or
threat of release of any hazardous materials at or on the property. The REQUESTING PARTY
is not a person who is liable for response activity costs, pursuant to MCL 324.20101 (vv) and
(ww).

        10.    If, subsequent to execution of this contract, previously unknown hazardous
substances are discovered within the PROJECT limits, which require environmental remediation
pursuant to either state or federal law, the REQUESTING PARTY, in addition to repotiing that
fact to the Michigan Department of Environment, Great Lakes, and Energy, shall immediately
notify the DEPARTMENT, both orally and in writing of such discovery. The DEPARTMENT
shall consult with the REQUESTING PARTY to determine if it is willing to pay for the cost of
remediation and, with the FHWA, to determine the eligibility, for reimbursement, of the
remediation costs. The REQUESTING PARTY shall be charged for and shall pay all costs
associated with such remediation, including all delay costs of the contractor for the PROJECT, in
the event that remediation and delay costs are not deemed eligible by the FHWA. If the
REQUESTING PARTY refuses to participate in the cost of remediation, the DEPARTMENT
shall terminate the PROJECT.          The parties agree that any costs or damages that the
DEPARTMENT incurs as a result of such termination shall be considered a PROJECT COST.

         11.    If federal and/or state funds administered by the DEPARTMENT are used to pay
the cost of remediating any hazardous substances discovered after the execution of this contract
and if there is a reasonable likelihood of recovery, the REQUESTING PARTY, in cooperation
with the Michigan Department of Environment, Great Lakes, and Energy and the
DEPARTMENT, shall make a diligent effort to recover such costs from all other possible
entities. If recove1y is made, the DEPARTMENT shall be reimbursed from such recovery for
the proportionate share of the amount paid by the FHWA and/or the DEPARTMENT and the
DEPARTMENT shall credit such sums to the appropriate funding source.


09/06/90 STPLSTAP.FOR 5/26/2021                     5
      12.     The DEPARTMENT'S sole reason for entering into this contract is to enable the
REQUESTING PARTY to obtain and use funds provided by the Federal Highway
Administration pursuant to Title 23 of the United States Code.

        Any and all approvals of, reviews of, and recommendations regarding contracts,
agreements, permits, plans, specifications, or documents, of any nature, or any inspections of
work by the DEPARTMENT or its agents pursuant to the terms of this contract are done to assist
the REQUESTING PARTY in meeting program guidelines in order to qualify for available
funds. Such approvals, reviews, inspections, and recommendations by the DEPARTMENT shall
not relieve the REQUESTING PARTY of its ultimate control and shall not be construed as a
warranty of their propriety or that the DEPARTMENT is assuming any liability, control, or
jurisdiction.

        The providing of recommendations or advice by the DEPARTMENT or its agents does
not relieve the REQUESTING PARTY and the local agencies, as applicable of their exclusive
jurisdiction of any of their highways and responsibility under MCL 691.1402 et seq., as
amended.

     When providing approvals, reviews and recommendations under this contract, the
DEPARTMENT or its agents is performing a governmental function, as that term is defined in
MCL 691.1401 et seq., as amended, which is incidental to the completion of the PROJECT.

       Upon completion of the PROJECT, the REQUESTING PARTY shall accept the facilities
constructed as built to specifications within the contract documents. It is understood that the
REQUESTING PARTY shall own the facilities and shall operate and maintain the facilities in
accordance with applicable law.

        13.    The DEPARTMENT, by executing this contract, and rendering services pursuant
to this contract, has not and does not assume jurisdiction of any REQUESTING PARTY
highway for purposes of MCL 691.1402 et seq., as amended. Exclusive jurisdiction of such
highway for the purposes of MCL 691.1402 et seq., as amended, rests with the REQUESTING
PARTY and other local agencies having respective jurisdiction.

        14.    The REQUESTING PARTY shall approve all of the plans and specifications to
be used on the PROJECT and shall be deemed to have approved all changes to the plans and
specifications when put into effect. It is agreed that ultimate responsibility and control over the
PROJECT rests with the REQUESTING PARTY and local agencies, as applicable.

         15.    The REQUESTING PARTY agrees that the costs reported to the DEPARTMENT
for this contract will represent only those items that are properly chargeable in accordance with
this contract. The REQUESTING PARTY also certifies that it has read the contract terms and
has made itself aware of the applicable laws, regulations, and terms of this contract that apply to
the reporting of costs incurred under the terms of this contract.

        16.    Each party to this contract will remain responsible for any and all claims arising
out of its own acts and/or omissions during the performance of the contract, as provided by this
contract or by law. In addition, this is not intended to increase or decrease either party's liability
09/06/90 STPLSTAP .FOR 5/26/2021                      6
for or immunity from tort claims. This contract is also not intended to nor will it be interpreted
as giving either party a right of indemnification, either by contract or by law, for claims arising
out of the performance of this contract.

        17.    The parties shall promptly provide comprehensive assistance and cooperation in
defending and resolving any claims brought against the DEPARTMENT by the contractor,
vendors or suppliers as a result of the DEPARTMENT'S award of the construction contract for
the PROJECT. Costs incurred by the DEPARTMENT in defending or resolving such claims
shall be considered PROJECT COSTS.

       18.     The DEPARTMENT shall require the contractor who is awarded the contract for
the constrnction of the PROJECT to provide insurance in the amounts specified and in
accordance with the DEPARTMENT'S current Standard Specifications for Construction and to:

               A.      Maintain bodily injmy and property damage insurance for the duration of
                       the PROJECT.

               B.      Provide owner's protective liability insurance naming as insureds the State
                       of Michigan, the Michigan State Transportation Commission, the
                       DEPARTMENT and its officials, agents and employees, the
                       REQUESTING PARTY and any other county, county road commission,
                       or municipality in whose jurisdiction the PROJECT is located, and their
                       employees, for the duration of the PROJECT and to provide, upon request,
                       copies of certificates of insurance to the insureds. It is understood that the
                       DEPARTMENT does not assume either ownership of any portion of the
                       PROJECT or jurisdiction of any REQUESTING PARTY highway as a
                       result of being named as an insured on the owner's protective liability
                       insurance policy.

               C.      Comply with the requirements of notice of cancellation and reduction of
                       insurance set forth in the current standard specifications for construction
                       and to provide, upon request, copies of notices and rep01is prepared to
                       those insured.




09/06/90 STPLSTAP.FOR 5/26/2021                      7
        19.        This contract shall become binding on the parties hereto and of full force and
effect upon the signing thereof by the duly authorized officials for the parties hereto and upon the
adoption of the necessary resolutions approving said contract and authorizing the signahll'es
thereto of the respective officials of the REQUESTING PARTY, a certified copy of which
resolution shall be attached to this contract.

        IN WITNESS WHEREOF, the pmties hereto have caused this contract to be executed as
written below.


CITY OF MUSKEGON                                     MICHIGAN DEPARTMENT
                                                     OF TRANSPORTATION

                                                            Bradley C. Wieferich   Bradley C. Wie feri ch
       Stephen Gawron    Stephen Gawron
                         Jul 2 202 1 8:45 A M               fo r: MOOT Director    Jul 8 2021 5:57 AM
By_ __ _ _ _ _ __ _ __                               By _ _ _ _ _ _ _ _ __
 Title:                                                 Department Director MDOT
                         Ann Marie Meisch
      Aun Marie Meisch   Jun 30 2021 3:37 PM
By _ _ _ _ _ _ _ _ _ _ _ __
 Title:




09/06/90 STPLSTAP.FOR 5/26/2021                      8
                                                                                May 26, 2021


                                         EXHIBIT I

                            CONTROL SECTION           NRT 61000
                            JOB NUMBER                208592CON
                            PROJECT                   21A0(562)



                                    ESTIMATED COST

CONTRACTED WORK

                                                  PART A         PARTB         TOTAL
       Estimated Cost                             $547,600       $ 10,000      $557,600




                                  COST PARTICIPATION

GRAND TOTAL ESTIMATED COST                        $547,600       $10,000       $557,600
Less Federal Funds *                              $481,888       $      0      $481,888
BALANCE (REQUESTING PARTY'S SHARE)                $ 65,712       $10,000       $ 75,712


*Federal Funds for the PROJECT are limited to an amount as described in Section 5.

NO DEPOSIT




09/06/90 STPLSTAP.FOR 5/26/2021                   9
DOT                                                           TYPEB
                                                 BUREAU OF HIGHWAYS
                                                              03-15-93




                                 PART II

                   STANDARD AGREEMENT PROVISIONS


           SECTION I   COMPLIANCE WITH REGULATIONS AND DIRECTIVES

           SECTION II PROJECT ADMINISTRATION AND SUPERVISION

           SECTION III ACCOUNTING AND BILLING

           SECTION IV MAINTENANCE AND OPERATION

           SECTION V   SPECIAL PROGRAM AND PROJECT CONDITIONS




03-15-93
                                        SECTION I

                  COMPLIANCE WITH REGULATIONS AND DIRECTIVES

A.     To qualify for eligible cost, all work shall be documented in accordance with the
       requirements and procedures of the DEPARTMENT.

B.    All work on projects for which reimbursement with Federal funds is requested shall be
      performed in accordance with the requirements and guidelines set fo1th in the following
      Directives of the Federal-Aid Policy Guide (FAPG) of the FHWA, as applicable, and as
      referenced in pertinent sections of Title 23 and Title 49 of the Code of Federal
      Regulations (CFR), and all supplements and amendments thereto.

       1.    Engineering

             a.      FAPG (6012.1): Preliminary Engineering

             b.      FAPO (23 CFR 172): Administration of Engineering and Design Related
                     Service Contracts

             c.      FAPG (23 CFR 635A): Contract Procedures

             d.      FAPG (49 CFR 18.22): Uniform Administrative Requirements for Grants
                     and Cooperative Agreements to State and -Local Governments-Allowable
                     Costs


      2.     Construction

             a.      FAPG (23 CFR 140E): Administrative Settlement Costs-Contract Claims

             b.      FAPG (23 CFR 140B): Constrnction Engineering Costs

             c.      FAPO (23 CFR 17): Recordkeeping and Retention Requirements for
                     Federal-Aid Highway Records of State Highway Agencies

             d.      FAPG (23 CFR 635A): Contract Procedures

             e.      F APG·(23 CFR 635B): Force Account Constrnction

             f.      FAPG (23 CFR        645A);    Utility   Relocations,   Adjustments   and
                     Reimbursement



03-15-93                                    2
             g.      FAPG (23 CFR 645B): Accommodation of Utilities (PPM 30-4.1)

              h.     FAPG (23 CFR 655F): Traffic Control Devices on Federal-Aid and other
                     Sh"eets and Highways

             i.      FAPO (49 CFR 18.22): Uniform Administrative Requirements for Grants
                     and Cooperative Agreements to State and Local Govemments-Allowable
                     Costs

       3.    Modification Or Construction Of Railroad Facilities

             a.      FAPG (23 CFR 1401): Reimbursement for Railroad Work

             b.      FAPG (23 CFR 646B): Railroad Highway Projects

C.    In confo1mance with FAPO (23 CFR 630C) Project Agreements, the political
      subdivisions party to this contract, on those Federally funded projects which exceed a
      total cost of $100,000.00 stipulate the following with respect to their specific
      jurisdictions:

       1.    That any facility to be utilized in perfmmance under or to benefit from this
             contract is not listed on the Environmental Protection Agency (EPA) List of
             Violating Facilities issued pursuant to the ·requirements of the Federal Clean Air
             Act, as amended, and the Federal Water Pollution Control Act, as amended.

      2.     That they each agree to comply with all of the requirements of Section 114 of the
             Federal Clean Air Act and Section 308 of the Federal \Yater Pollution Control
             Act, and all regulations and guidelines issued thereunder.

      3.     That as a condition of Federal aid pursuant to this conh·act they shall notify the
             DEPARTMENT of the receipt of any advice indicating that a facility to be
             utilized in performance under or to benefit from this contract is under
             consideration to be listed on the EPA List of Violating Facilities.

D.    Ensure that the PROJECT is constrncted in accordance with and incorporates all
      committed environmental impact mitigation measures listed in approved environmental
      documents unless modified or deleted by approval of the FHWA.

E.    All the requirements, guidelines, conditions and restrictions noted in all other pertinent
      Directives and Instructional Memoranda of the FHWA will apply to this contract and will
      be adhered to, as applicable, by the pa1iies hereto.




03-15-93                                      3
                                         SECTION II

                    PROJECT ADMINISTRATION AND SUPERVISION


A.     The DEPARTMENT shall provide such administrative guidance as it determines is
       required by the PROJECT in order to facilitate the obtaining of available federal and/or
       state fonds.

B.    The DEPARTMENT will advertise and award all contracted po1iions of the PROJECT
      work. Prior to advertising of the PROJECT for receipt of bids, the REQUESTING
      PARTY may delete any po1iion or all of the PROJECT work. After receipt of bids for
      the PROJECT, the REQUESTING PARTY shall have the right to reject the amount bid
      for the PROJECT prior to the award of the contract for the PROJECT only if such
      amount exceeds by ten percent (10%) the final engineer1s estimate therefor. If such
      rejection of the bids is not received in writing within two (2) weeks after letting, the
      DEPARTMENT will assume concunence. The DEPARTMENT may, upon request,
      readve1iise the PROJECT. Should the REQUESTING PARTY so request in writing
      within the aforesaid two (2) week period after letting, the PROJECT will be cancelled
      and the DEPARTMENT will refund the unused balance of the deposit less all costs
      inctmed by the DEPARTMENT.

C.    The DEPARTMENT will perform such inspection services on PROJECT work
      perfonned by the REQUESTING PARTY with its own forces as is required to ensure
      compliance with the approved plans & specifications.

D.    On those projects funded with Federal monies, the DEPARTMENT shall as may be
      required secure from the FHWA approval of plans and specifications, and such cost
      estimates for FHWA participation in the PROJECT COST.

E.    All work in connection with the PROJECT shall be performed in conformance with the
      Michigan Department of Transportation Standard Specifications for Consh'l1ction, and the
      supplemental specifications, Special Provisions and plans pertaining to the PROJECT
      and all materials furnished and used in the constrnction of the PROJECT shall conform to
      the aforesaid specifications. No extra work shall be perfonned nor changes in plans and
      specifications made until said work or changes are approved by the project engineer and
      authorized by the DEPARTMENT.




03-15-93                                      4
F.     Should it be necessary or desirable that p01iions of the work covered by this contract be
       accomplished by a consulting finn, a railway company, or govenunental agency, firm,
       person, or corporation, under a subcontract with the REQUESTING PARTY at
       PROJECT expense, such subcontracted arrangements will be covered by formal written
       agreement between the REQUESTING PARTY and that patty.

      This fonnal written agreement shall: include a reference to the specific prime contract to
      which it pe11ains; include provisions which clearly set forth the maximum reimbursable
      and the basis of payment; provide for the maintenance of accounting records in
      accordance with generally accepted accounting principles, which clearly document the
      actual cost of the services provided; provide that costs eligible for reimbursement shall be
      in accordance with clearly defined cost criteria such as 49 CFR Pati 18, 48 CFR Part 31,
      23 CFR Part 140, 0MB Circular A-87, etc. as applicable; provide for access to the
      department or its representatives to inspect and audit all data and records related to the
      agreement for a minimum of three years after the depmiment's final payment to the local
      unit.

      All such agreements will be submitted for approval by the DEPARTivIBNT and, if
      applicable, by the FHWA prior to execution thereof, except for agreements for amounts
      less than $100,000 for preliminary engineering and testing services executed under and in
      accordance with the provisions of the "Small Purchase Procedures" FAPG (23 CFR 172),
      which do not require prior approval of the DEPARTMENT or the FHW A.

      Any such approval by the DEPARTMENT shall in no way be consh-ued as a warranty of
      the subcontractor's qualifications, financial integrity, or ability to perform the work being
      subcontracted.

G.    The REQUESTING PARTY, at no cost to the PROJECT or the DEPARTMENT, shall
      make such arrangements with railway companies, utilities, etc., as may be necessary for
      the perfonnance of work required for the PROJECT but for which Federal or other
      reimbursement will not be requested.

H.    The REQUESTING PARTY, at no cost to the PROJECT, or the DEPARTMENT, shall
      secure, as necessary, all agreements and approvals of the PROJECT with railway
      companies, the Railroad Safety & Tariffs Division of the DEPARTMENT and other
      concerned governmental agencies other than the FHWA, and will forward same to the
      DEPARTMENT for such reviews and approvals as may be required.

I.    No PROJECT work for which reimbursement will be requested by the REQUESTING
      PARTY is to be subcontracted or performed until the DEPARTMENT gives written
      notification that such work may commence.




03-15-93                                       5
J.    The REQUESTING PARTY shall be responsible for the payment of all costs and
      expenses incurred in the performance of the work it agrees to undeiiake and perform.

K.    The REQUESTING PARTY shall pay directly to the party perfonning the work all
      billings for the services performed on the PROJECT which are authorized by or through
      the REQUESTING PARTY.

L.    The REQUESTING PARTY shall submit to the DEPARTMENT all paid billings for
      which reimbursement is desired in accordance with DEPARTMENT procedures.

M.    All work by a consulting firm will be performed in compliance with the applicable
      provisions of 1980 PA 299, Subsection 2001, MCL 339.2001; MSA 18.425(2001), as
      well as in accordance with the provisions of all previously cited Directives of the FHW A.

N.    The project engineer shall be subject to such administrative guidance as may be deemed
      necessary to ensure compliance with program requirement and, in those instances where
      a consultant fim1 is retained to provide engineering and inspection services, the personnel
      performing those services shall be subject to the same conditions.

0.    The DEPARTMENT, in administering the PROJECT in accordance with applicable
      Fe9eral and State requirements and regulations, neither assumes nor becomes liable for
      any obligations undertaken or arising between the REQUESTING PARTY and any other
      party with respect to the PROJECT.

P.    In the event it is determined by the DEPARTMENT that there will be either insufficient
      Federal funds or insufficient time to properly administer such funds for the entire
      PROJECT or portions thereof, the DEPARTMENT, prior to advertising or issuing
      authorization for work performance, may cancel the PROJECT, or any portion thereof,
      and upon written notice to the patties this contract shall be void and of no effect with
      respect to that cancelled portion of the PROJECT. Any PROJECT deposits previously
      made by the paliies on the cancelled portions of the PROJECT will be promptly
      refunded.

Q.    Those projects funded with Federal monies will be subject to inspection at all times by
      the DEPARTMENT and the FHWA.




03-15-93                                      6
                                         SECTION III

                               ACCOUNTING AND BILLING


A.     Procedures for billing for work undertaken by the REQUESTING PARTY:

       1.    The REQUESTING PARTY shall establish and maintain accurate records, in
             accordance with generally accepted accounting principles, of all expenses
             incurred for which payment is sought or made under this contract, said records to
             be hereinafter referred to as the 11RECORDS 11 , Separate accounts shall be
             established and maintained for all costs incurred under this contract,

             The REQUESTING PARTY shall maintain the RECORDS for at least three (3)
             years from the date of final payment of Federal Aid made by the DEPARTMENT
             under this contract. In the event of a dispute with regard to the allowable
             expenses or any other issue under th.is contract, the REQUESTING PARTY shall
             thereafter continue to maintain the RECORDS at least until that dispute has been
             finally decided and the time for all available challenges· or appeals of that decision
             has expired.

             The DEPARTMENT, or its representative, may inspect, copy, or audit the
             RECORDS at any reasonable time after giving reasonable notice.

             If any part of the work is subcontracted, the REQUESTING PARTY shall assure
             compliance with the above for all subcontracted work.

             In the event that an audit perfo1med by or on behalf of the DEPARTMENT
             indicates an adjustment to the costs repo1ied under this contract, or questions the
             allowability of an item of expense, the DEPARTMENT shall promptly submit to
             the REQUESTING PARTY, a Notice of Audit Results and a copy of the audit
             report which may supplement or modify any tentative findings verbally
             communicated to the REQUESTING PARTY at the completion of an audit,

             Within sixty (60) days after the date of the Notice of Audit Results, the
             REQUESTING PARTY shall: (a) respond in writing to the responsible Bureau or
             the DEPARTMENT indicating whether or not it concurs with the audit report, (b)
             clearly explain the nature and basis for any disagreement as to a disallowed item
             of expense and, (c) submit to the DEPARTMENT a written explanation as to any
             questioned or no opinion expressed item of expense, hereinafter refened to as the
             "RESPONSE". The RESPONSE shall be clearly stated and provide any
             supporting documentation necessary to resolve any disagreement or questioned or
             no opinion expressed item of expense. Where the documentation is voluminous,
             the REQUESTING PARTY may supply appropriate excerpts and make alternate


03-15-93                                       7
           arrangements to conveniently and reasonably make that documentation available
           for review by the DEPARTMENT. The RESPONSE shall refer to and apply the
           language of the contract. The REQUESTING PARTY agrees that failure to
           submit a RESPONSE within the sixty (60) day period constitutes agreement with
           any disallowance of an item of expense and authorizes the DEPARTMENT to
           finally disallow any items of questioned or no opinion expressed cost.

           The DEPARTMENT shall make its decision with regard to any Notice of Audit
           Results and RESPONSE within one hundred twenty (I 20) days after the date of
           the Notice of Audit Results.         If the DEPARTMENT dete1mines that an
           overpayment has been made to the REQUESTING PARTY, the REQUESTING
           PARTY shall repay that amount to the DEPARTMENT or reach agreement with
           the DEPARTMENT on a repayment schedule within thirty (30) days after the
           date of an invoice from the DEPARTMENT. If the REQUESTING PARTY fails
           to repay the overpayment or reach agreement with the DEPARTMENT on a
           repayment schedule within the thirty (30) day period, the REQUESTING PARTY
           agrees that the DEPARTMENT shall deduct all or a portion of the overpayment
           from any. fonds then or thereafter payable by the DEPARTMENT to the
           REQUESTING PARTY under th.is contract or any other agreement, or payable to
           the REQUESTING PARTY under the tenns of 1951 PA 51, as applicable.
           Interest will be assessed on any partial payments or repayment schedules based on
           the unpaid balance at the end of each month until the balance is paid in full. The
           assessment of interest will begin thirty (30) days from the date of the invoice.
           The rate of interest will be based on the Michigan Department of Tre;1sury
           common cash funds interest earnings. The rate of interest will be reviewed
           annually by the DEPARTMENT and adjusted as necessary based on the Michigan
           Department of Treasu1y common cash funds interest earnings.                    The
           REQUESTING PARTY expressly consents to this withholding or offsetting of
           funds under those circumstances, reserving the right to file a lawsuit in the Comt
           of Clain1s to contest the DEPARTMENT'S decision only as to any item of
           expense the disallowance of which was disputed by the REQUESTING PARTY
           in a timely filed RESPONSE.

           The REQUESTING PARTY shall comply with the Single Audit Act of 1984, as
           amended, including, but not limited to, the Single Audit Amendments of 1996 (31
           USC 7501-7507).

           The REQUESTING PARTY shall adhere to the following requirements
           associated with audits of accounts and records:

           a. Agencies expending a total of $500,000 or more in federal funds, from one or
           more funding sources in its fiscal year, shall comply with the requirements of the
           federal Office of Management and Budget (0MB) Circular A-133) as revised or
           amended.


03-15-93                                   8
           The agency shall submit two copies of:

                   The Reporting Package
                   The Data Collection Form
                   The management letter to the agency, if one issued by the audit firm

           The 0MB Circular A-133 audit must be submitted to the address below in
           accordance with the· time frame established in the circular, as revised or amended.

           b. Agencies expending less than $500,000 in federal funds must submit a letter to
           the Department advising that a circular audit was not required, The letter shall
           indicate the applicable fiscal year, the amount of federal funds spent, the name(s)
           of the Department federal programs, and the CFDA grant number(s). This
           info1mation must also be submitted to the address below.

           c. Address:    Michigan Depa1tment of Education
                          Accounting Service Center
                          Hannah Building
                          608 Allegan Street
                          Lansing, MI 48909

           d. Agencies must also comply with applicable State laws and regulations relative
           to audit requirements.

           e. Agencies shall not charge audit costs to Department's federal programs which
           are not in accordance with the 0MB Circular A-133 requirements.

           f. All agencies are subject to the federally required monitoring activities, which
           may include limited scope reviews and other on-site monitoring.

      2.   Agreed Unit Prices Work - All billings for work undertaken by the
           REQUESTING PARTY on an agreed unit price basis will be submitted in
           accordance with the Michigan Department of Transportation Standard
           Specifications for Construction and pertinent FAPO Directives and Guidelines of
           the FHWA.

      3.   Force Account Work and Subcontracted Work - All billings submitted to the
           DEPARTMENT for Federal reimbursement for items of work performed on a
           force account basis or by any subcontract with a consulting firm, railway
           company, governmental agency or other party, under the terms of this contract,
           shall be prepared in accordanse with the provisions of the pertinent FHPM
           Directives and the procedures of the DEPARTMENT. Progress billings may be
           submitted monthly dming the time work is being performed provided, however,
           that no bill of a lesser amount than $1,000.00 shall be submitted unless it is a final


03-15-93                                     9
            or encl of fiscal year billing. All billings shall be labeled either "Progress Bill
            Number _ _ _ ", or 11 Final Billing".

      4.    Final billing under this contract shall be submitted in a timely manner but not later
            than six months after completion of the work. Billings for \vork submitted later
            than six months after completion of the work will not be paid.

      5.    Upon receipt of billings for reimbursement for work undertaken by the
            REQUESTING PARTY on projects funded with Federal monies, the
            DEPARTMENT will act as billing agent for the REQUESTING PARTY,
            consolidating said billings with those for its own force account work and
            presenting these consolidated billings to the FHWA for payment. Upon receipt of
            reimbursement from the FHWA, the DEPARTMENT will promptly forward to
            the REQUESTING PARTY its share of said reimbursement.

      6.    Upon receipt of billings for reimbursement for work undertaken by the
            REQUESTING PARTY on projects funded with non-Federal monies, the
            DEPARTMENT will promptly forward to the REQUESTING PARTY
            rein1bursement of eligible costs.

B.    Payment of Contracted and DEPARTMENT Costs:

      1.    As work on the PROJECT commences, the initial payments for contracted work
            and/or costs incurred by the DEPARTMENT will be made from the working
            capital deposit. Receipt of progress payments of Federal funds, and where
            applicable, State Critical Bridge funds, will be used to replenish the working
            capital deposit. The REQUESTING PARTY sh.all make prompt payments of its
            share of the contracted and/or DEPARTMENT incmred portion of the PROJECT
            COST upon receipt of progress billings from the DEPARTMENT. Progress
            billings will be based upon the REQUESTING PARTY'S share of the actual costs
            incurred as work on the PROJECT progresses and will be submitted, as required,
            until it is determined by the DEPARTMENT that there is sufficient available
            working capital to meet the remaining anticipated PROJECT COSTS. All
            progress payments will be made within thhiy (30) days of receipt of billings. No
            monthly billing of a lesser amount than $1,000.00 will be made unless it is a final
            or end of fiscal year billing. Should the DEPARTMENT dete1mine that the
            available working capital exceeds the remaining anticipated PROJECT COSTS,
            the DEPARTMENT may reimburse the REQUESTING PARTY such excess.
            Upon completion of the PROJECT, payment of all PROJECT COSTS, receipt of
            all applicable monies from the FHWA, and completion of necessary audits, the
            REQUESTING PARTY will be reimbursed the balance of its deposit.




03-15-93                                     10
       2.    In the event that the bid, plus contingencies, for the contracted, and/or the
             DEPARTMENT incuned portion of the PROJECT work exceeds the estimated
             cost therefor as established by this contract, the REQUESTING PARTY may be
             advised and billed for the additional amount of its share.

C.    General Conditions:

             The DEPARTMENT, in accordance with its procedures in existence and covering
             the time pedod involved, shall make payment for interest earned on the balance of
             working capital deposits for all projects on account with the DEPARTMENT.
             The REQUESTING PARTY in accordance with DEPARTMENT procedures in
             existence and covering the time period involved, shall make payment for interest
             owed on any deficit balance of working capital deposits for all projects on
             account with the DEPARTMENT. This payment or billing is processed on an
             annual basis corresponding to the State of Michigan fiscal year. Upon receipt of
             billing for interest incuned, the REQUESTING PARTY promises and shall
             promptly pay the DEPARTMENT said amount.

      2.    Pursuant to the authority granted by law, the REQUESTING PARTY hereby
            frrevocably pledges a sufficient amount of funds received by it from the Michigan
            Transp01tation Fund to meet its obligations as specified in PART I and PART II.
            If the REQUESTING PARTY shall fail to make any of its required payments
            when due, as specified herein, the DEPARTMENT shall i.tm11ediately notify the
            REQUESTING PARTY and the State Treasurer of the State of Michigan or such
            other state officer or agency having charge and control over disbursement of the
            Michigan Transportation Fund, pursuant to law, of the fact of such default and the
            amount thereof, and, if such default is not cured by payment within ten (10) days,
            said State Treasurer or other state officer or agency is then authorized and
            directed to withhold from the first of such monies thereafter allocated by law to
            the REQUESTING PARTY from the Michigan Transpo1tation Fund sufficient
            monies to remove the default, and to credit the REQUESTING PARTY with
            payment thereof, and to notify the REQUESTING PARTY in writing of such fact.

      3.    Upon completion of all work under this contract and final audit by the
            DEPARTMENT or the FHWA, the REQUESTING PARTY promises to
            promptly repay the DEPARTMENT for any disallowed 'items of costs previously
            disbursed by the DEPARTMENT. The REQUESTING PARTY pledges its
            future receipts from the Michigan Transportation Fund for repayment of all
            disallowed items and, upon failure to make repayment for any disallowed items
            within ninety (90) days of demand made by the DEPARTMENT, the
            DEPARTMENT is hereby authorized to withhold an equal amount from the
            REQUESTING PARTY'S share of any future distribution of Michigan
            Transp01tation Funds in settlement of said claim.



03-15-93                                    11
      4.    The DEPARTMENT shall maintain and keep accurate records and accounts
            relative to the cost of the PROJECT and upon completion of the PROJECT,
            payment of all items of PROJECT COST, receipt of all Federal Aid, if any, and
            completion of final audit by the DEPARTMENT and if applicable, by the FHWA,
            shall make final accounting to the REQUESTING PARTY. The final PROJECT
            accounting will not include interest earned or charged on working capital
            deposited for the PROJECT which will be accounted for separately at the close of
            the State of Michigan fiscal year and as set forth in Section C(l).

       5.   The costs of engineering and other services performed on those projects involving
            specific program funds and one hundred percent (100%) local funds will be
            apportioned to the respective po1tions of that project in the same ratio as the
            actual direct construction costs unless otherwise specified in PART I.




03-15-93                                   12
                                        SECTION IV

                             MAINTENANCE AND OPERATION


A.    Upon completion of construction of each part of the PROJECT, at no cost to the
      DEPARTMENT or the PROJECT, each of the parties hereto, within their respective
      jurisdictions, will make the following provisions for the maintenance and operation of the
      completed PROJECT:

       1.    All Projects:

             Properly maintain and operate each part of the project, making ample provisions
             each year for the performance of such maintenance work as may be required,
             except as qualified in paragraph 2b of this section.

      2.     Projects Financed in Part with Federal Monies:

             a.      Sign and mark each patt of the PROJECT, in accordance with the current
                     Michigan Manual of Unifonn Traffic control Devices, and will not install,
                     or permit to be installed, any signs, signals or markings not in
                     confo1mance with the standards approved by the FHWA, pursuant to 23
                     USC 109(d).

             b.      Remove, prior to completion of the PROJECT, all encroachments from the
                     roadway right-of-way within the limits of each part of the PROJECT.

                     With respect to new or existing utility installations within the right-of-way
                     of Federal Aid projects and pursuant to FAPG (23 CFR 645B):
                     Occupancy of non-limited access right-of-way may be allowed based on
                     consideration for traffic safety and necessary preservation of roadside
                     space and aesthetic quality. Longitudinal occupancy of non-limited access
                     right-of-way by piivate lines will require a finding of significant economic
                     hardship, the unavailability of practicable alternatives or other extenuating
                     circumstances.

             C.      Cause to be enacted, maintained and enforced, ordinances and regulations
                     for proper traffic operations in accordance with the plans of the
                     PROJECT,

             cl.     Make no changes to ordinances or regulations enacted, or traffic contrnls
                     installed in conjunction with the PROJECT work without pdor review by
                     the DEPARTMENT and approval of the FHWA, ifrequirecl.



03-15-93                                      13
B.    On projects for the removal of roadside obstacles, the parties, upon completion of
      construction of each patt of the PROJECT, at no cost to the PROJECT or the
      DEPARTMENT, will, within their respective jurisdictions, take such action as is
      necessary to assure that the roadway right-of-way, cleared as the PROJECT, will be
      maintained free of such obstacles.

C.    On projects for the constrnctlon of bikeways, the patties will enact no ordinances or
      regulations prohibiting the use of bicycles on the facility hereinbefore described as the
      PROJECT, and will amend any existing restrictive ordinances in this regard so as to
      allow use of this facility by bicycles. No motorized vehicles shall be pe1mitted on such
      bikeways or walkways constrncted as the PROJECT except those for maintenance
      purposes.

D.    Failure of the parties hereto to fulfill their respective responsibilities as outlined herein
      may disqualify that patty from future Federal-aid participation in projects on roads or
      streets for which it has maintenance responsibility. Federal Aid may be withheld until
      such time as deficiencies in regulations have been corrected, and the improvements
      constmcted as the PROJECT are brought to a satisfactory condition of maintenance.




03-15-93                                       14
                                           SECTIONV

                    SPECIAL PROGRAM AND PROJECT CONDITIONS

A.     Those projects for which the REQUESTING PARTY has been reimbursed with Federal
       monies for the acquisition of right-of-way must be under constrnction by the close of the
       twentieth (20th) fiscal year following the fiscal year in which the FHWA and the
       DEPARTMENT projects agreement covering that work is executed, or the
       REQUESTING PARTY may be required to repay to the DEPARTMENT, for forwarding
       to the FHWA, all monies distributed as the FHWA'S contribution to that right-of-way.

B.    Those projects for which the REQUESTING PARTY has been reimbursed with Federal
      monies for the performance of preliminary engineering must be under constrnction by the
      close of the tenth (10th) fiscal year following the fiscal year in which the FHWA and the
      DEPARTMENT projects agreement covering that work is executed, or the
      REQUESTING PARTY may be required to repay to the DEPARTMENT, for forwarding
      to the FHWA, all monies distributed as the FHWA'S conhi.bution to that preliminary
      engineering.

C.    On those projects funded with Federal monies, the REQUESTING PARTY, at no cost to
      the PROJECT or the DEPARTMENT, will provide such accident infonnation as is
      av(lilable and such other infom1ation as may be required under the program in order to
      make the proper assessment of the safety benefits derived from the work performed as the
      PROJECT. The REQUESTING PARTY will cooperate with the DEPARTMENT in the
      development ofreports and such analysis as may be required and will, when requested by
      the DEPARTMENT, forward to the DEPARTMENT, in such form as is necessary, the
      required information.

D.    In connection with the perfonnance of PROJECT work under this contract the parties
      hereto (hereinafter in Appendix 11 A 11 referred to as the 11 contractor11 ) agree to comply with
      the State of Michigan provisions for "Prohibition of Discrimination in State Contracts">
      as set fo1ih in Appendix A, attached hereto and made a part hereof. The parties further
      covenant that they will comply with the Civil Rights Acts of 1964, being P.L. 88-352, 78
      Stat. 241> as amended, being Title 42 U.S.C. Sections 1971, 1975a-1975d> and 2000a-
      2000h-6 and the Regulations of the United States Department of Transportation (49
      C.F.R. Part 21) issued pursuant to said Act, including Appendix 11 B 11 , attached hereto and
      made a part hereof, and will require similar covenants on the part of any contractor or
      subcontractor employed in the performance of this contract.

E.    The parties will carry out the applicable requirements of the DEPARTMENT'S
      Disadvantaged Business Enterprise (DBE) program and 49 CFR, Pali 26> including, but
      not limited to, those requirements set forth in Appendix C.




03-15-93                                         15
                               APPENDIX A
            PROHIBITION OF DISCRIMINATION IN STATE CONTRACTS

In connection with the performance of work under this contract; the contractor agrees as follows:

1.     In accordance with Public Act 453 of 1976 (Elliott-Larsen Civil Rights Act), the
       contractor shall not discriminate against an employee or applicant for employment with
       respect to hire, tenure, treatment, terms, conditions, or privileges of employment or a
       matter directly or indirectly related to employment because of race, color, religion,
       national origin, age, sex, height, weight, or marital status. A breach of this covenant will
       be regarded as a material breach of this contract. Further, in accordance with Public Act
       220 of 1976 (Persons with Disabilities Civil Rights Act), as amended by Public Act 478
       of 1980, the contractor shall not discriminate against any employee or applicant for
       employment with respect to hire, tenure, terms, conditions, or privileges of employment
       or a matter directly or indirectly related to employment because of a disability that is
       unrelated to the individual's ability to perform the duties of a pa1ticular job or position. A
       breach of the above covenants will be regarded as a material breach of this contract.

2.     The contractor hereby agrees that any and all subconh·acts to this contract, whereby a
       po1tion of the work set forth in this contract is to be performed, shall contain a covenant
       the same as hereinabove set fo1th in Section 1 of this Appendix.

3.     The contractor will take affirmative action to ensure that applicants for employment and
       employees are treated without regard to their race, color, religion, national origin, age,
       sex, height, weight, marital stah1s, or any disability that is unrelated to the individual's
       ability to perfo1m the duties of a particular job or position. Such action shall include, but
       not be limited to, the following: employment; treatment; upgrading; demotion or transfer;
       recrnitment; advertising; layoff or termination; rates of pay or other forms of
       compensation; and selection for training, including apprenticeship.

4.     The conh·actor shall, in all solicitations or advertisements for employees placed by or on
       behalf of the contractor, state that all qualified applicants will receive ~onsideration for
       employment without regard to race, color, religion, national origin, age, sex, height,
       weight, marital status, or disability that is unrelated to the individual's ability to perform
       the duties of a paiticular job or position.

5.     The contractor or its collective bargaining representative shall send to each labor union or
       representative of workers with which the contractor has a collective bargaining
       agreement or other contract or understanding a notice advising such labor union or
       workers' representative of the contractor's conunitments under this Appendix.

6.     The contractor shall comply with all relevant published rnles, regulations, directives, and
       orders of the Michigan Civil Rights Commission that may be in effect prior to the taking
       of bids for any individual state project.
7.   The contractor shall furnish and file compliance reports within such time and upon such
     forms as provided by the Michigan Civil Rights Co1mnission; said forms may also elicit
     information as to the practices, policies, program, and employment statistics of each
     subcontractor, as well as the contractor itself, and said contractor shall permit access to
     the contractor's books, records, and accounts by the Michigan Civil Rights Commission
     and/or its agent for the pmposes of investigation to ascertain compliance under this
     contract and relevant rules, regulations, and orders of the Michigan Civil Rights
     Commission.

8.   In the event that the Michigan Civil Rights Commission finds, after a hearing held
     pursuant to its rules, that a contractor has not complied with the contractual obligations
     under this contract, the Michigan Civil Rights Commission may, as a part of its order
     based upon such findings, certify said findings to the State Administrative Board of the
     State of Michigan, which State Administrative Board may order the cancellation of the
     contract found to have been violated and/or declare the contractor ineligible for future
     contracts with the state and its political and civil subdivisions, depmtments, and officers,
     including the governing boards of institutions of higher education, until the conh·actor
     complies with said order of the Michigan Civil Rights Commission. Notice of said
     declaration of future ineligibility may be given to any or all of the persons with whom the
     contractor is declared ineligible to contract as a contracting party in future contracts. In
     any case before the Michigan Civil Rights Cotmnission in which cancellation of an
     existing contract is a possibility, the contracting agency shall be notified of such possible
     remedy and shall be given the option by the Michigan Civil Rights Commission to
     participate in such proceedings.

9.   The contractor shall include or incorporate by reference, the provisions of the foregoing
     paragraphs (1) through (8) in every subcontract or purchase order unless exempted by
     niles, regulations, or orders of the Michigan Civil Rights Cotrunission; all subcontracts
     and purchase orders will also state that said provisions will be binding upon each
     subcontractor or supplier.


                                                                              Revised June 2011
                                        APPENDIXB
                                    TITLE VI ASSURANCE

During the performance of this contract, the contractor, for itself, its assignees, and its successors
in interest (hereinafter referred to as the "contractor"), agrees as follows:

1.     Compliance with Regulations: For all federally assisted programs, the contractor shall
       comply with the nondiscrimination regulations set forth in 49 CFR Part 21, as may be
       amended from time to time (hereinafter referred to as the Regulations). Such Regulations
       are incorporated herein by reference and made a part of this contract.

2.     Nondiscrimination: The contractor, with regard to the work perfonned under the
       contract, shall not discriminate on the grounds of race, color, sex, or national origin in the
       selection, retention, and treatment of subcontractors, including procurements of materials
       and leases of equipment. The contractor shall not participate either directly or indirectly
       in the discrimination prohibited by Section 21.5 of the Regulations, including
       employment practices, when the contractor covers a program set forth in Appendix B of
       the Regulations.

3.     Solicitation for Subcontracts, Including Procurements of Materials and Equipment:
       All solicitations made by the contractor, either by competitive bidding or by negotiation
       for subcontract work, including procurement of materials or leases of equipment, must
       include a notification to each potential subcontractor or supplier of the contractor's
       obligations under the contract and the Regulations relative to nondiscrimination on the
       grounds ofrace, color, or national origin.

4.     Information and Reports: The conh·actor shall provide all info1mation and reports
       required by the Regulations or directives issued pursuant thereto and shall permit access
       to its books, records, accounts, other sources of information, and facilities as may be
       determined to be pertinent by the Department or the United States Department of
       Transportation (USDOT) in order to asce1iain compliance with such Regulations or
       directives. If required information concerning the contractor is in the exclusive
       possession of another who fails or refuses to furnish the required info1mation, the
       contractor shall certify to the Depaiiment or the USDOT, as appropriate, and shall set
       forth the efforts that it made to obtain the information.

5.     Sanctions for Noncompliance: In the event of the contractor's noncompliance with the
       nondiscrimination provisions of this contract, the Department shall impose such contract
       sanctions as it or the USDOT may determine to be appropriate, including, but not limited
       to, the following:

       a.      Withholding payments to the contractor until the contractor complies; and/or

       b.      Canceling, terminating, or suspending the contract, in whole al' in part.
6,   Incorporation of Provisions: The contractor shall include the provisions of Sections (1)
     through (6) in every subcontract, including procurement of material and leases of
     equipment, unless exempt by the Regulations or directives issued pursuant thereto. The
     contractor shall take such action with respect to any subcontract or procurement as the
     Department or the USDOT may direct as a means of enforcing such provisions, including
     sanctions for non-compliance, provided, however, that in the event a contractor becomes
     involved in or is threatened with litigation from a subcontractor or supplier as a result of
     such direction, the contractor may request the Department to enter into such litigation to
     protect the interests of the state. In addition, the contractor may request the United States
     to enter into such litigation to protect the interests of the United States.



                                                                              Revised June 2011
                                    APPENDIXC

              TO BE INCLUDED IN ALL FINANCIAL ASSISTANCE
                  AGREEIVIENTS WITH LOCAL AGENCIES

               Assurance that Recipients and Contractors Must Make
                (Excerpts from US DOT Regulation 49 CFR 26,13)


A.   Each financial assistance agreement signed with a DOT operating administration
     (or a primary recipient) must include the following assurance:

           The recipient shall not discriminate on the basis of race, color,
           national origin, or sex in the award and performance of any US
           DOT-assisted contract or in the administration of its DBE
           program or the requirements of 49 CFR Part 26. The recipient
           shall take all necessary and reasonable steps under 49 CFR
           Part 26 to ensure nondiscrimination in the award and
           administration of US DOT-assisted contracts. The recipient's
           DBE program, as required by 49 CFR Part 26 and as
           approved by US DOT, is incorporated by reference in this
           agreement.      Implementation of this program is a legal
           obligation and failure to carry out its terms shall be treated as
           a violation of this agreement.        Upon notification to the
           recipient of its failure to carry out its appl'oved program, the
           department may impose sanctions as provided for under Part
           26 and may, in appropriate cases, refer the matter for
           enforcement under 18 U.S.C. 1001 and/or the Program Fraud
           Civil Remedies Act of 1986 (31 U.S,C. 3801 et seq.),

B.   Each contract MDOT signs with a contractor (and each subcontract the prime
     contractor signs with a subcontractor) must include the following assurance:

           The contractor, sub recipient or subcontractor shall not
           discriminate on the basis of race, color, national origin, or sex
           in the performance of this contract, The contractor shall cany
           out applicable requirements of 49 CFR Part 26 in the award
           and administration of US DOT-assisted contracts. Failure by
           the contractor to carry out these requirements is a matel'ial
           breach of this contract, which may result in the termination of
           this contract or such other remedy as the recipient deems
           appropriate.

Top of Page


New Agenda Notifications

* indicates required