Round-a-bout/Traffic Circle Detour December 21, 2020

December 21, 2020

[av_image src=’https://muskegon-mi.gov/cresources/roudaboutclosure-1030×616.jpg’ attachment=’21259′ attachment_size=’large’ copyright=” caption=” styling=” align=’center’ font_size=” overlay_opacity=’0.4′ overlay_color=’#000000′ overlay_text_color=’#ffffff’ animation=’fade-in’ hover=’av-hover-grow av-hide-overflow’ appearance=” link=’lightbox’ target=” title_attr=” alt_attr=” lazy_loading=’disabled’ id=” custom_class=” av_element_hidden_in_editor=’0′ av_uid=’av-kiympuwe’ admin_preview_bg=”][/av_image] [av_textblock size=” av-medium-font-size=” av-small-font-size=” av-mini-font-size=” font_color=” color=” id=” custom_class=” av_uid=’av-kiymrjiy’ admin_preview_bg=”]
Road closure and round-about/traffic circle closure/detour for Monday December 21, 2020.
Contractor will be removing sand and placing boulders around the base of future artwork at the Pere Marquette Round-a-bout/Traffic Circle.
Westbound Lakeshore Drive traffic to Beach Street will be detoured at Cottage Grove to Resort then onto Beach Street, northbound to parking lot north of the Water Filtration Plant then onto Beach Street at Wilcox.
East bound Beach Street traffic will be detoured at Beach Street/Wilcox south through parking lot to Beach Street south of the Round-a-bout/Traffic Circle on to Beach Street south of the Water Filtration Plant.
[/av_textblock]