Water System Improvements – Water Treatment Plant Beach Street Transmission Main Flow Meter

August 30, 2023

The project consists of furnishing all material and constructing the following: furnishing and installation of one (1) insertion flow meter on the Beach Street water transmission main (30” Class 200 DIP), including installation of precast flow meter chamber; all associated electrical, controls, instrumentation, and site work. The project includes all necessary appurtenances and restoration.